UAE breaks ground on world’s first and largest solar storage project
$6 billion Abu Dhabi facility to deliver continuous renewable power by 2027, creating 10,000 jobs
ABU DHABI, UAE (MNTV) — The United Arab Emirates has broken ground on the world’s first and largest 24/7 renewable energy project, integrating a massive solar photovoltaic (PV) system with advanced battery storage technology to provide uninterrupted green electricity around the clock.
Developed by Masdar in collaboration with the Emirates Water and Electricity Company (EWEC), the $6 billion project will generate up to 1 gigawatt (GW) of continuous baseload power — operating 24 hours a day, seven days a week — marking a global first in renewable energy engineering.
The groundbreaking ceremony was attended by Sheikh Theyab bin Mohamed bin Zayed Al Nahyan, Deputy Chairman of the Presidential Court for Development and Fallen Heroes’ Affairs, according to a Masdar statement.
The project combines a 5.2GW solar PV plant with a 19 gigawatt-hour (GWh) battery energy storage system (BESS), utilizing artificial intelligence for predictive analytics, intelligent dispatch, and system optimization.
The integration will ensure consistent renewable power delivery even during nighttime or low sunlight conditions.
Masdar said the facility will become operational by 2027 and will supply energy at a “globally competitive tariff.” It is also expected to create more than 10,000 jobs during construction and operation phases while avoiding approximately 5.7 million tonnes of carbon emissions annually.
The project will also support local manufacturing and supply chain development, contributing to the UAE’s Net Zero 2050 strategy and cementing its role as a global renewable energy pioneer.
Earlier this year, Masdar finalized contracts for engineering, procurement, and construction (EPC) partners, as well as suppliers of solar modules and BESS equipment, paving the way for full-scale implementation.